Publication:
Streamlining Production: ECRS Approach to Enhancing Efficiency in Case Tank Sub Weld of Hydraulic Excavator

dc.contributor.authorWonginyoo C.
dc.contributor.authorBumpen P.
dc.contributor.authorWangphanich P.
dc.contributor.authorChoomrit N.
dc.contributor.correspondenceWonginyoo C.
dc.contributor.otherSrinakharinwirot University
dc.date.accessioned2026-02-19T19:00:02Z
dc.date.issued2025-10-01
dc.date.issuedBE2568-10-01
dc.description.abstractThis research aimed to reduce the production time in the manufacturing process of fuel tanks, with a focus on enhancing the efficiency of the process to better meet customer demands. A study of the production process revealed that the primary issue was in the welding stage at the top of the tank using a robot, which took 2 hours and 45 minutes. Almost half (1 hour 22 minutes) of the time were spent on setting the position of the workpiece— a step that must be repeated each time a new workpiece was introduced. This significantly contributed to reducing throughput and increasing labor costs. To address this issue, the research team applied the ECRS concept to analyze and streamline the production process by eliminating unnecessary steps. Consequently, the team designed and developed a workpiece holding fixture to assist in the welding process. This fixture ensured the workpiece was positioned accurately without the need for repeated setup. Two conceptual designs of the fixture were initially developed and evaluated using FEA. After evaluation by engineers and welding staff, using AHP, the best option was determined. As a result of this improvement, cycle time in robotic welding was reduced to 1 hour and 23 minutes a 49.26% reduction.
dc.identifier.citationEngineering and Technology Horizons Vol.42 No.4 (2025)
dc.identifier.doi10.55003/ETH.420401
dc.identifier.eissn29851688
dc.identifier.scopus2-s2.0-105029820817
dc.identifier.urihttps://hdl.handle.net/20.500.14740/55255
dc.rights.holderSCOPUS
dc.subjectEngineering
dc.subjectBusiness, Management and Accounting
dc.subjectChemical Engineering
dc.titleStreamlining Production: ECRS Approach to Enhancing Efficiency in Case Tank Sub Weld of Hydraulic Excavator
dc.typeArticle
dspace.entity.typePublication
oaire.citation.issue4
oaire.citation.titleEngineering and Technology Horizons
oaire.citation.volume42
oairecerif.author.affiliationSrinakharinwirot University
swu.datasource.scopushttps://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=105029820817&origin=inward