Title: Construction techniques and development of 1st monorail system in Thailand
Authors: Sirisonthi A.
Julphunthong P.
Suparp S.
Joyklad P.
Keywords: Concrete beams and girders
Light rail transit
Load testing
Prestressed concrete
Site selection
Construction technique
Economic opportunities
Elevated structures
Precast construction
Prestressed concrete beams
Rapid transit systems
Stiff clays
Transit systems
Rapid transit
Issue Date: 2019
Abstract: This paper aims to present the construction techniques and development of first and unique monorail system in Bangkok, Thailand. Bangkok is the capital and most populous city of Thailand. The city occupies 1,568.7 km2 and has a population of over eight million, or 12.6 percent of the country's population. In the last decade, Bangkok has attracted millions of migrants seeking economic opportunity and city is expanding quickly. Recently, Mass Rapid Transit Authority (MRTA) Thailand has decided to adopt monorail system in Bangkok as a rapid transit system due to the limited space, narrow roads and sharp curves in the city. The design of monorail track lines permits flexible and various alignments that include curves of small radiuses and large slopes. The first two projects i.e., Pink Line and Yellow Line projects consist of elevated structure around 64.9 km long, 53 stations, 2 depots and 2 park-and-ride buildings. MRTA has awarded these projects (design, test run and construction of first two lines) to the BSR Joint Venture who invited Sino-Thai Engineering & Construction Public Company Limited (STECON), Thailand, as exclusive contractor to be responsible for civil works including design, construction and installation of different components. In contrast to the traditional monorail girders, STECON proposed a novel four-span post-tensioned girder system in which pre-cast monorail girders will be post-tensioned in such a way that post-tension tendons will run through four consecutive spans. The salient features of the proposed system are low cost, safe and less construction time. © 20th Congress of IABSE, New York City 2019: The Evolving Metropolis - Report. All rights reserved.
URI: https://ir.swu.ac.th/jspui/handle/123456789/12534
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85074450462&partnerID=40&md5=932e801ce5487cf334b7bdb1ea6a9812
Appears in Collections:Scopus 1983-2021

Files in This Item:
There are no files associated with this item.


Items in SWU repository are protected by copyright, with all rights reserved, unless otherwise indicated.