Please use this identifier to cite or link to this item:
https://ir.swu.ac.th/jspui/handle/123456789/12416
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Kaoudom N. | |
dc.contributor.author | Yimtrakarn T. | |
dc.contributor.author | Choomrit N. | |
dc.date.accessioned | 2021-04-05T03:03:15Z | - |
dc.date.available | 2021-04-05T03:03:15Z | - |
dc.date.issued | 2019 | |
dc.identifier.other | 2-s2.0-85066621228 | |
dc.identifier.uri | https://ir.swu.ac.th/jspui/handle/123456789/12416 | - |
dc.identifier.uri | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85066621228&doi=10.1109%2fIEA.2019.8715225&partnerID=40&md5=2d3aed6bc2e1b75527ee197d98f1c18a | |
dc.description.abstract | The DMAIC process in Six Sigma technique was utilized for studying and analyzing to reduce defects in sport bar products. From gathering primary data, the major problem was on the products' surfaces accounted for 19.40%, included scratches, dent, pinhole and tool mark. The way to improve consisted of five phases, which were 1) Define: collect historical data to specify the scope of problem and use the Pareto chart to highlight important defects 2) Measure: identify and prioritize causes using failure mode and effects analysis (FMEA) 3) Analyze: detect root causes and develop possible actions from Why-why analysis 4) Improve: follow the guidelines, including material replacement for welding fixtures, new wrapping material during transport and work instruction for polishing machine, and 5) Control: summarize via standardizing the operating manual. After doing all five phases, the result found that the proportion of the defects decreased to be 2.5%. © 2019 IEEE. | |
dc.subject | Defects | |
dc.subject | Process engineering | |
dc.subject | Process monitoring | |
dc.subject | Sports | |
dc.subject | Work simplification | |
dc.subject | DMAIC | |
dc.subject | Failure mode and effects analysis | |
dc.subject | FMEA | |
dc.subject | Historical data | |
dc.subject | Six Sigma techniques | |
dc.subject | Welding fixtures | |
dc.subject | Why-why analysis | |
dc.subject | Work instructions | |
dc.subject | Six sigma | |
dc.title | Using DMAIC Methodology to Reduce Defects in Sport Bar Products | |
dc.type | Conference Paper | |
dc.rights.holder | Scopus | |
dc.identifier.bibliograpycitation | 2019 IEEE 6th International Conference on Industrial Engineering and Applications, ICIEA 2019. (2019), p.852-855 | |
dc.identifier.doi | 10.1109/IEA.2019.8715225 | |
Appears in Collections: | Scopus 1983-2021 |
Files in This Item:
There are no files associated with this item.
Items in SWU repository are protected by copyright, with all rights reserved, unless otherwise indicated.